Saturn gas®turbines have proven themselves in over 4800 installations. Introduced in 1960, they have logged more than 620-million operating hours and are available in a single-shaft, constant-speed configuration for driving generators.
In order to reduce their costs at the energy-intensive factory, Ceramica Sichenia installed a 1.1 MWe Saturn 20 gas turbine generator set.
Learn More